Time interval
Cross-section data: September 2023
Field display
< td>Serial numberTable of rectification contents within a time limit |
---|
License number |
Unit name |
Industry category |
Corrective issues |
Corrective measures |
Corrective time limit |
Corrective plan |
Is rectification completed |
Sample data
td>License number | Unit name | Industry category | 12500000MB1G99780M001R | Chongqing Fire Hospital | General Hospital | 1 | Rectify the waste gas treatment facilities of the sewage treatment plant | The odor of the sewage treatment plant is collected through the pipeline and then activated After carbon adsorption and deodorization, the odor is discharged into the air through a 15m high exhaust pipe. | 2022-12-31 to 2023-06-30 | The odor from the sewage treatment plant is collected through pipelines and deodorized by activated carbon adsorption and then discharged into the air through a 15m high exhaust pipe. | |
---|---|---|---|---|---|---|---|---|---|---|---|
12410000416307487B001R | The First Affiliated Hospital of Henan University | General Hospital | 1 | Incomplete procedures | The environmental impact assessment and acceptance procedures have not been completed, and rectification is being carried out. | 2020-08-05 to 2021-08-04 | Within one year, environmental impact assessment and acceptance procedures will be completed. | Yes | |||
12410000416307487B001R | The First Affiliated Hospital of Henan University | General Hospital | 2 | Incomplete procedures | Failed to complete environmental impact assessment and acceptance procedures, and make rectifications. | 2021-08-30 to 2022-08-29 | Within one year, environmental impact assessment and acceptance procedures will be completed. | Yes | |||
12410000416307487B001R | The First Affiliated Hospital of Henan University | General Hospital | 3 | Others | No sewage station flow online equipment, deodorization system and boiler low nitrogen burner installed | 2023-03-09 to 2023-05-31 | Sewage station flow online equipment, deodorization system and boiler low nitrogen burner installed | No | |||
92532801MA6KTPPF46001R | Jinghong New Energy Waste Oil Recycling Plant | Environmental Sanitation Management | 1 | No exhaust pipe for organized emission | Change unorganized emission to organized emission of waste gas within a time limit | 2023-02-21 to 2023-08-21 | Install an exhaust pipe no less than 15 meters to discharge waste gas in an organized manner. | ||||
9141020474253815XD001R | Kaifeng Fushengxiang Food Co., Ltd. | Livestock slaughter | 1 | Nitrogen oxides cannot meet management requirements. | The boiler is equipped with a "low nitrogen combustion + flue gas circulation" device. | 2019-05-31 to 2019-08-31 | The rectification has been completed | ||||
9141020474253815XD001R | Kaifeng Fushengxiang Food Co., Ltd. | Livestock slaughter | 2 | The malodorous gas from the sewage station is currently discharged in an unorganized manner and does not meet the relevant requirements. | The sewage station is sealed, and ventilation equipment is set up to introduce the malodorous gas into the activated carbon device for adsorption treatment, and then discharged through a 15m high exhaust pipe. | 2019-05-31 to 2019-08-31 | Rectification has been completed | ||||
9141020474253815XD001R | Kaifeng Fushengxiang Food Co., Ltd. | Livestock slaughter | 3 | Others-no automatic monitoring equipment installed/used and connected to the Internet | Install wastewater online monitoring equipment (monitoring factors are pH, COD, ammonia nitrogen), and connect to the Environmental Protection Bureau | 2023-02-16 to 2023-07-31 | Complete the installation of online wastewater monitoring equipment (monitoring factors are pH, COD, and ammonia nitrogen) according to the rectification time limit, and connect to the Environmental Protection Bureau | ||||
9152062834713557X0004R | Songtao County Yuguang No. 1 and No. 2 slag storage leachate treatment station | Electrolytic manganese | 1 | Incomplete procedures | No environmental impact assessment procedures obtained | 2023-02-04 to 2024-02-03 | Speed up the environmental impact assessment and improve other relevant procedures | ||||
9152062834713557X0003R | Songtao Miao Autonomous County Jingyu Environmental Protection Investment Co., Ltd. Chengnan Manganese-related Wastewater Centralized Treatment Station | Wastewater treatment and recycling | 1 | Incomplete procedures | Speed up the environmental impact assessment | 2023-02-04 to 2 024-02-03 | Speed up the environmental impact assessment and improve other relevant procedures | ||||
91410324MA3X5E26XJ001R | Luanchuan County Kaiyuan Municipal Engineering Co., Ltd. | Wastewater treatment and recycling | 1 | Others-Automatic monitoring equipment is not installed/used and connected to the Internet | Install automatic online monitoring equipment at the water inlet and outlet of the sewage treatment plant as required, as well as the corresponding inspection content and pollution factors. | 2023-01-17 to 2024-01-16 | Complete the installation and commissioning of self-monitoring equipment by the end of August 2023, and complete the networking with the monitoring center of Luoyang Ecological Environment Bureau and Luanchuan County Environmental Protection Bureau by the end of the year. | ||||
916301007105391310005R | Qinghai Tianpu Weiye Environmental Protection Technology Co., Ltd. Dulan Branch (Dulan County Xiangride Town Wastewater Treatment Plant) | Wastewater treatment and recycling | 1 | Others-No installation/use of automatic monitoring equipment in parallel网 | Complete the installation and acceptance of automatic online equipment as soon as possible | 2023-01-05 to 2023-04-04 | Complete rectification and change within the prescribed period | ||||
91320322086977524U001R | Jiangsu Dibang Construction Engineering Co., Ltd. Co., Ltd. | Metal surface treatment and heat treatment processing | 1 | Not yet environmental protection acceptance | Has signed an environmental assessment acceptance contract with Xinjiang Youjie Testing Co., Ltd. | 2022-10-01 to 2023-06-30 | Has signed an environmental assessment acceptance contract with Xinjiang Youjie Testing Co., Ltd., and is expected to be completed in June 2023 Complete acceptance before the 30th of the month | ||||
91500110321770022N001R | Guoneng Chongqing Power Plant Co., Ltd. | Thermal power generation | 1 | Incomplete procedures | After applying for a sewage outlet permit, complete the relevant information of the sewage discharge permit. | 2022-12-08 to 2023-02-28 | / | ||||
91500110321770022N001R | Guoneng Chongqing Power Plant Co., Ltd. | Thermal power generation | 2 | The temporary storage room for hazardous waste has not been fully built | Accelerate the construction of the temporary storage room for hazardous waste and properly store hazardous waste before it is built. | 2022-12-08 to 2023-04-30 | / | ||||
914202220985319769002R | Yangxin Tianyuan Building Materials Co., Ltd. | Stone processing for construction | 1 | The waste gas generated by the crushing and screening process is not discharged in an organized manner as required, and there are no pollution prevention and control measures | Bag dust collectors and exhaust pipes that meet the requirements of the specifications (not less than 15m) are installed in the crushing equipment and screening equipment processes, and the emission ports are equipped with detection holes and environmental protection signs according to the specifications. After completion, a third-party testing agency is commissioned to monitor the emission of various pollutants in the waste gas, and the implementation of pollution prevention and control facilities is determined based on whether the standards are met. | 2022-11-28 to 2023-11-27 | Commissioned to a third party for construction, rectification completed on schedule | ||||
914202220985319769002R | Yangxin Tianyuan Building Materials Co., Ltd. | Construction stone processing | 2 | The raw material yard is not equipped with three-sided fences and a roof; the factory area and road surface are not hardened | 1. The raw material yard is equipped with three-sided fences and a roof 2. The factory area and roads are hardened | 2022-11-28 to 2023-11-27 | Construction by a third party, rectification completed on schedule | ||||
91522702MA7BY3P02Q001R | Guizhou Phosphate New Materials Technology Co., Ltd. | Inorganic salt manufacturing | 1 | Others - Failure to set up pollutant discharge outlets in accordance with regulations | Construction shall be strictly in accordance with the requirements of the EIA report approval, and the height of all organized waste gas discharge outlets of this project shall be increased to 30 meters, and the manual monitoring platform shall be constructed in a standardized manner. | 2022-10-20 to 2023-01-20 | Before January 20, 2023, the height of all organized waste gas discharge outlets shall be increased to 30 meters, and the manual monitoring platform shall be standardized. | ||||
91522702MA7BY3P02Q001R | Guizhou Phosphate New Materials Technology Co., Ltd. | Inorganic Salt Manufacturing | 2 | Others-Automatic monitoring equipment is not installed/used and connected to the Internet | According to the requirements of the Technical Specifications for Application and Issuance of Pollutant Discharge Permits (Inorganic Chemical Industry), a continuous online flue gas monitoring system shall be added to the tail gas discharge outlet of the calcination section and connected to the environmental authorities. | 2022-10-20 to 2023-03-20 | Before March 20, 2023, in accordance with the requirements of the Technical Specifications for Application and Issuance of Pollutant Discharge Permits (Inorganic Chemical Industry), a continuous online monitoring system for particulate matter shall be built at the tail gas emission outlet of the calcination section and connected to the environmental authorities. | ||||
91522702MA7BY3P02Q001R | Guizhou Phosphate New Materials Technology Co., Ltd. | Inorganic Salt Manufacturing | 3 | Other issues | The total amount of particulate matter of the project shall be recalculated and submitted to the ecological environment authority for approval, combined with the calculation method of the pollutant discharge permit, and finally compared with the total amount after the change and approval of the administrative authority, and strictly implemented. | 2022-10-20 to 2023-01-20 | Complete communication and consultation with the ecological environment authorities before January 20, 2023, and solve the problems of the total amount of particulate matter in the environmental impact assessment report and the implementation of the total amount of particulate matter in the emission permit. | ||||
91441823MA57CJP924001R | Miyang Building Materials (Qingyuan) Co., Ltd. | Paint manufacturing | 1 | Pollution control facilities are not installed and used | According to regulations, the waste gas from material storage, batching, mixing, stirring, dispersing, grinding, and packaging processes shall be collected in a closed manner and treated with feasible technical pollution control facilities. | 2022-11-08 to 2023-10-26 | 1. From now until August 1, 2023, formulate waste gas pollution control plans, build waste gas pollution control facilities, debug and put them into normal operation in accordance with the industry self-monitoring technical specifications, the application and issuance of pollutant discharge permits and other regulations. 2. Submit rectification reports and pollutant discharge permit application materials before September 1, 2023. 3. Carry out self-monitoring strictly in accordance with the regulations. | ||||
91441823MA57CJP924001R | Miyang Building Materials (Qingyuan) Co., Ltd. | Paint Manufacturing | 2 | No sampling platform has been built at the pollutant discharge outlet | A sampling platform shall be built at the waste gas discharge outlet DA001 in accordance with regulations. | 2022-11-08 to 2023-04-26 | 1. The sampling platform shall be built in accordance with the "Technical Requirements for Standardized Remediation of Sewage Outlets (Trial)" (Environmental Monitoring [1996] No. 470), "Notice on Issuing the Guidelines for Standardized Setting of Sewage Outlets of Pollution Sources in Guangdong Province" (Guangdong Environmental [2008] No. 42) and other regulations. 2. Submit rectification report and application materials for pollutant discharge permit before September 1, 2023. | ||||
91620725561109380P001R | Tianyi Quarry, Shandan County | Construction stone processing | 1 | Not in compliance with current regulations | Build fully enclosed plant and enclosed corridor, all production equipment must be installed in the enclosed plant; | 2022-09-30 to 2023-09-29 | 1. Prepare funds and determine the construction unit from October 2022. 2. Complete the construction of fully enclosed plant, enclosed corridor and solid waste storage room before November 15, 2022. 3. Complete the application for pollutant discharge permit before September 30, 2023. | ||||
11622424015327348B002R | Tongwei County Yigangchuan Town Domestic Waste Landfill | Environmental Sanitation Management | 1 | Failure to set up groundwater monitoring wells in accordance with the Pollution Control Standard for Domestic Waste Landfills (GB16889-2008) | According to the basic requirements for groundwater quality monitoring in 10.2 of the Pollution Control Standard for Domestic Waste Landfills (GB16889-2008), a background well is set 30-50m upstream of the landfill area; a pollution diffusion well is set 30-50m on each side of the vertical groundwater flow of the landfill; and a pollution monitoring well is set 30m and 50m downstream of the landfill groundwater flow. | 2022-09-21 to 2023-09-20 | According to the rectification notice, apply for funds as soon as possible and set up five monitoring wells within the rectification time limit in accordance with the basic requirements of groundwater quality monitoring in 10.2 of the "Standards for Pollution Control of Domestic Waste Landfills" (GB16889-2008). Apply for a discharge permit after the rectification is completed. | ||||
91331127MA28JEBU58001R | Jingning Langjing Water Operation Management Co., Ltd. | Wastewater treatment and recycling | 1 | Others - Automatic monitoring equipment not installed/used and connected to the Internet | According to the Technical Specifications for Application and Issuance of Pollutant Discharge Permits for Water Treatment (Trial) HJ978-2018, the inlet main flow, chemical oxygen demand, and ammonia nitrogen indicators of urban sewage treatment plants and other domestic sewage treatment plants must be automatically monitored, and the automatic monitoring data of the inlet main must be connected to the pollution source automatic monitoring system platform of the local ecological and environmental authorities. At present, the water inlet main has not been equipped with automatic monitoring facilities for ammonia nitrogen and chemical oxygen demand. During the rectification period, automatic monitoring facilities for ammonia nitrogen and chemical oxygen demand will be added and connected to the superior competent department | 2022-08-08 to 2023-08-07 | During the rectification period, automatic monitoring equipment will be purchased and installed, and connected to the superior competent department | ||||
12370322493213580Y002R | Gaoqing County Second People's Hospital (Gaoqing County Mental Health Center, Gaoqing County Disabled Rehabilitation and Care Center) | Comprehensive Hospital | 1 | Others | Automatic flow monitoring equipment installed at wastewater outlets | 2022-09-05 to 2023-09-04 | / | ||||
113305230025737262001R | People's Government of Hanggai Town, Anji County | Wastewater treatment and recycling | 1 | Others-Automatic monitoring equipment not installed/used and connected to the Internet | Auto The monitoring is not connected to the network. Please complete the debugging and connect to the network within the rectification time limit. | 2022-08-31 to 2022-11-30 | Complete the debugging and connect to the network within the rectification time limit | ||||
91370783MA3MWGY58G001R | Shou Guangming Ye Plastic Co., Ltd. | Waste Resource Comprehensive Utilization Industry | 1 | The sewage outlet setting does not meet the national and local requirements | The enterprise promises to complete the waste gas discharge within 2 months after obtaining the sewage discharge permit Standardized rectification and acceptance of the outlet | 2020-01-01 to 2020-03-01 | |||||
91522702MAALQPQG0L001R | Guizhou Yuneng New Energy Battery Materials Co., Ltd. | Basic chemical raw material manufacturing | 1 | Other-no automatic monitoring equipment installed/used and connected to the network | In accordance with the requirements of the technical specifications for the application and issuance of industry pollutant discharge permits, install pollutant discharge automatic equipment and connect it to the ecological environment department. | 2022-08-17 to 2023-08-16 | Complete the installation of pollutant discharge automatic equipment and connect it to the ecological environment department on August 16, 2023. | No | |||
113305236617130838001R | Anji County Comprehensive Administrative Law Enforcement Bureau (Anji County Comprehensive Administrative Law Enforcement Brigade, Anji County Urban Management Bureau) | Environmental Sanitation Management | 1 | Pollution control equipment has not been installed | Pollution control equipment has been installed and emissions have met standards | 2022-08-31 to 2022-12-31 | Complete pollution control within the rectification time limit Treatment equipment is installed and the discharge reaches the standard | ||||
91620702566438757D002R | Zhangye Denghai Seed Co., Ltd. | Agricultural product primary processing activities | 1 | Other-Automatic monitoring equipment is not installed/used and connected to the Internet | Corrective measures (I) Ensure that funds and personnel are in place1. Determine a dedicated person to ensure that funds are in place and that the task is carried out in a timely and smooth manner; 2. Actively cooperate with the winning bidder to carry out related work and ensure that the rectification plan is completed on schedule. (II) Ensure that the rectification task is completed on scheduleStrictly carry out the rectification work at each stage in accordance with the established time limit requirements, make all preparations as early as possible, and complete the rectification task in accordance with the time limit requirements. After ensuring that the online monitoring facilities are installed on time, apply for the pollution discharge permit on schedule. (III) Ensure that the emission meets the standard during the rectification period 1. During the rectification period, strictly follow the requirements of the "Notice on the Clearance, Sorting and Rectification of Pollutant Emission Permits for Stationary Pollution Sources and the Registration of Pollutant Emission Permits in 2020" to ensure that the emission meets the standard. 2. Entrust a third-party testing agency to actively carry out self-monitoring and keep relevant records to ensure that the emission meets the standard. | 2022-08-25 to 2023-08-24 | Zhangye Denghai Seed Co., Ltd.'s rectification plan for the installation of the boiler pollutant online monitoring system Zhangye Municipal Ecological Environment Bureau Ganzhou Branch: Zhangye Denghai Seed Co., Ltd. is located at No. 16, Oasis Avenue, Ganzhou District, Zhangye City, Gansu Province. Two 25-ton circulating fluidized bed boilers were completed and put into operation in September 2012. Dedicated to the corn seed processing production line in September and October each year, the heat source output of the drying production process. According to the requirements of the Ministry of Ecology and Environment's "Notice on the Rectification of Pollutant Emission Permits for Stationary Pollution Sources and the Registration of Pollutant Emission Permits in 2020" (Environmental Protection Office Environmental Assessment Letter (2019) 939) and "Notice on the Deadline for Rectification of Pollutant Emissions from Stationary Pollution Sources", our unit failed to complete the installation of the boiler online monitoring system in a timely manner. In order to speed up the rectification of the problem and successfully obtain the pollutant emission permit, combined with the actual situation of our unit, the rectification plan is formulated as follows: I. Rectification issues and time limits 1. Rectification issues: The installation of the online monitoring system for nitrogen oxide pollutants at the flue gas outlet of two 25-ton circulating fluidized bed boilers was not completed as required; 2. Rectification time limit: The above issues must be rectified before August 20, 2023. II. Rectification schedule 1. Submit the plan and demonstrate the project by the end of 2022. 2. Complete the approval of the headquarters project in March 2023. 3. Organize bidding in May 2023. 4. Implement the installation of the online monitoring system and complete the networking in June 2023. 5. Apply for a pollutant emission permit before August 20, 2023. III. Rectification measures (i) Ensure that funds and personnel are in place 1. Identify a dedicated person to ensure that funds are in place and that the task is carried out in a timely and smooth manner; 2. Actively cooperate with the winning bidder to carry out related work to ensure that the rectification plan is completed on schedule. (ii) Ensure that the rectification task is completed on schedule Strictly carry out the rectification work at each stage in accordance with the established time limit requirements, make all preparations as early as possible, and complete the rectification task in accordance with the time limit requirements. After ensuring that the online monitoring facilities are installed on time, apply for the pollutant discharge permit on schedule. (iii) Ensure that the emission meets the standard during the rectification period 1. During the rectification period, strictly follow the requirements of the "Notice on the Clearance, Sorting and Rectification of Pollutant Discharge Permits for Fixed Pollution Sources and the Registration of Pollutant Discharge Permits in 2020" to ensure that the emission meets the standard. 2. Entrust a third-party testing agency to actively carry out self-monitoring and keep relevant records to ensure that the emission meets the standard. 4. During the rectification period, our unit strictly implemented the relevant regulations and requirements of the "Guidelines for Self-Monitoring Technology of Polluting Units for Thermal Power Generation and Boilers" (HJ820-2017) and the "Water Quality Standards for Sewage Discharge into Urban Sewers" (GB/T31962), and carried out self-monitoring. The monitoring frequency shall be implemented in accordance with Table 1. Table 1 Emission outlet number Emission outlet name Pollutant name (concentration limit) Monitoring implementation Manual monitoring frequency DA001 No. 1 boiler emission outlet flue gas blackness (level 1) Manual 1 time/month Nitrogen oxides (200mg/Nm3) Manual 1 time/month Sulfur dioxide (50mg/Nm3) Manual 1 time/month Particulate matter (20mg/Nm3) Manual 1 time/month DA002 No. 2 boiler emission outlet flue gas blackness (level 1) Manual 1 time/month Nitrogen oxides (200mg/Nm3) Manual 1 time/month Sulfur dioxide (50mg/Nm3) Manual 1 time/month Particulate matter (20mg/Nm3) Manual 1 time/month | ||||
11621102013935710T003R | People's Government of Guanying Town, Anding District, Dingxi City | Wastewater treatment and recycling | 1 | Others - Automatic monitoring equipment not installed/used and connected to the Internet | According to the self-monitoring requirements of the Technical Specifications for Application and Issuance of Pollutant Discharge Permits for Water Treatment, urban sewage treatment plants need to install automatic monitoring devices for water inlet flow, chemical oxygen demand, and ammonia nitrogen; urban sewage treatment plants need to install automatic monitoring devices for outfall flow, chemical oxygen demand, ammonia nitrogen, pH, water temperature, total phosphorus, and total nitrogen. | 2022-08-24 to 2023-08-23 | According to the rectification notice, apply for funds as soon as possible, and install automatic monitoring devices based on flow, chemical oxygen demand, and ammonia nitrogen at the water inlet of the sewage treatment plant and connect them to the network in accordance with the self-monitoring requirements of the "Technical Specifications for Application and Issuance of Pollutant Discharge Permits Water Treatment" within the rectification time limit; install automatic monitoring devices based on flow, chemical oxygen demand, ammonia nitrogen, pH, water temperature, total phosphorus, and total nitrogen at the total sewage outlet and connect them to the network. | ||||
122323004146590751001R | Suihua City Appearance and Environmental Sanitation Service Center | Environmental Sanitation Management | 1 | Others-Automatic monitoring equipment not installed/used and connected to the Internet | Automatic water treatment monitoring equipment not installed | 2022-08-03 to 2023-08-02 | Automatic water treatment monitoring equipment installed and connected to the environmental supervisors | ||||
122323004146590751001R | Suihua City Urban Appearance and Environmental Sanitation Service Center | Environmental Sanitation Management | 2 | Incomplete procedures | Environmental assessment and acceptance procedures have not been completed | 2022-08-03 to 2023-08-02 | Release relevant environmental protection procedures within one year | ||||
122323004146590751001R | Suihua City Urban Appearance and Environmental Sanitation Service Center | Environmental Sanitation Management | 3 | The anti-seepage grade and requirements do not meet the requirements of the "Landfill Pollution Prevention and Control Measures for Domestic Waste" Control Standards (GB16889-2008) and EIA Approval | The anti-seepage level and requirements do not meet the "Pollution Control Standards for Domestic Waste Landfills" (GB16889-2008) and EIA Approval | 2022-08-03 to 2023-08-02 | Within one year, the anti-seepage of the anti-seepage project must meet the requirements and comply with the "Pollution Control Standards for Domestic Waste Landfills" (GB16889-2008) and EIA Approval Requirements | ||||
122323004146590751001R | Suihua City Appearance and Environmental Sanitation Service Center | Environmental Sanitation Management | 4 | Improvement measures for landfill odor control | Improvement measures for landfill odor control should be taken within a time limit | 2022-08-03 to 2023-08-02 | Install odor control measures that meet the requirements within one year | ||||
91430426MA4Q92QLXR001R | Hengyang Hongshengda New Energy Co., Ltd. | Lithium-ion battery manufacturing | 1 | Solid waste disposal | Hazardous waste must sign an agreement with a qualified hazardous waste disposal unit | 2 019-10-01 to 2019-12-30 | No | ||||
91430426MA4Q92QLXR001R | Hengyang Hongshengda New Energy Co., Ltd. | Lithium-ion battery manufacturing | 2 | Unorganized discharge in electrolyte injection process | Adding organized treatment facilities in electrolyte injection process | 2019-10-01 to 2019-12-30 | No | ||||
91430426MA4Q92QL XR001R | Hengyang Hongshengda New Energy Co., Ltd. | Lithium-ion battery manufacturing | 3 | No test report | Entrust a qualified unit to conduct the test | 2019-09-30 to 2019-12-30 | No | ||||
91321191321166693Q001R | Zhenjiang Dadong Electronics Co., Ltd. | Other electronic equipment manufacturing | 1 | Domestic sewage is not connected to the municipal sewage pipe network | Due The local municipal sewage network is not connected, and the company's domestic sewage is temporarily treated in septic tanks and reused for irrigation of surrounding farmland. We now promise to take over and treat domestic sewage in a timely manner after the sewage network is connected | 2019-09-17 to 2020-09-17 | |||||
91321191MA1MURUX7D001R | Zhenjiang Aodong Electronics Co., Ltd. | Other electronic equipment manufacturing | 1 | Domestic sewage is not connected to the municipal sewage network | Because the local municipal sewage network is not connected, the company's domestic sewage is temporarily treated in septic tanks and reused for irrigation of surrounding farmland Irrigation, now promise to take over and treat domestic sewage in time after the sewage pipe network is connected | 2019-09-18 to 2020-09-18 | |||||
91621102MA744BPUX2001R | Dingxi Kanghua Orthopedic Hospital | Specialized Hospital | 1 | Other-no automatic monitoring equipment installed/used and connected to the network | According to the self-monitoring requirements of the "Technical Specifications for Application and Issuance of Pollutant Discharge Permits for Medical Institutions", the sewage outlet of the sewage treatment plant where medical comprehensive wastewater is discharged into the urban sewage treatment plant shall be equipped with online monitoring equipment based on flow and connected to the network. According to the self-monitoring requirements of the "Technical Specifications for Application and Issuance of Pollutant Discharge Permits for Medical Institutions", the sewage outlet for medical comprehensive wastewater discharged into the urban sewage treatment plant shall be equipped with online monitoring equipment based on flow rate and connected to the network. | 2022-08-02 to 2023-08-01 | According to the rectification notice, apply for funds as soon as possible, and install online monitoring equipment based on flow rate and connect to the network at the medical wastewater outlet within the rectification time limit in accordance with the self-monitoring requirements of the "Technical Specifications for Application and Issuance of Pollutant Discharge Permits for Medical Institutions". | ||||
91130681MA0GA8YA6T001R | North China Aluminum New Materials Technology Co., Ltd. | Aluminum rolling processing | 1 | No drainage permit | Apply for drainage permit | 2022-06-01 to 2023-05-31 | The company plans to conduct relevant tests, apply for drainage permits, and change the sewage discharge permit before May 31, 2023 During the rectification period, self-monitoring shall be carried out according to the self-monitoring requirements. | ||||
91610303MA6X9WMC2P001R | Shaanxi Baiyifang Construction Engineering Co., Ltd. | Wastewater treatment and recycling | 1 | Others - automatic monitoring equipment is not installed/used and connected to the network | 1. Automatic monitoring shall be adopted for water temperature, total phosphorus and total nitrogen (daily monitoring before the technical specifications for automatic monitoring of total nitrogen are issued and implemented) at the total wastewater discharge outlet. 2. Online monitoring equipment for inlet and outlet water shall be connected to the automatic monitoring system platform of pollution sources of the ecological environment department. | 2022-07-25 to 2023-01-24 | Install automatic monitoring equipment for water temperature, total phosphorus and total nitrogen at the wastewater outlet as required, and complete the networking of the online monitoring facilities for inlet and outlet water with the automatic monitoring system platform of the pollution source of the ecological environment department. | ||||
9114112208097113X0001R | Shanxi Qianneng Mengtian Building Materials Co., Ltd. | Wooden doors and windows manufacturing | 1 | No treatment measures have been taken for boiler nitrogen oxides | Low nitrogen transformation of boiler exhaust gas | 2019-12-31 to 20 20-04-30 | |||||
91542200783526665T001V | Shannan Medical Waste Centralized Disposal Center | Hazardous Waste Management-Incineration | 1 | Other-Automatic monitoring equipment not installed/used and connected to the Internet | Online monitoring Test equipment networking | 2022-07-12 to 2023-07-11 | Contact the network service provider as soon as possible and connect the equipment to the network | ||||
91511011206562914R001R | Neijiang Dongxing District Hongda Foundry | Ferrous Metal Casting | 1 | Cannot meet emission standards | Correct waste gas pollution control facilities as required and provide monitoring data for compliance | 2022-06-30 to 2023-06-29 | After consulting relevant technical personnel, please ask a qualified third-party monitoring company to monitor after installing the equipment | ||||
91511011206562914 R001R | Neijiang Dongxing District Hongda Foundry | Ferrous Metal Casting | 2 | Others-Automatic monitoring equipment not installed/used and connected to the Internet | In accordance with technical specifications, automatic monitoring equipment is installed and connected to the ecological environment department | 2022-06-30 to 2023-06-29 | Through consultation with relevant technical personnel, purchase and install automatic monitoring equipment and connect to the ecological environment department | ||||
91320413785566193D001R | Changzhou Tanglong Electronics Co., Ltd. | Special equipment manufacturing for semiconductor devices | 1 | The sewage connection port is not equipped with a chemical oxygen demand ammonia nitrogen online detector | Set up online detectors according to specification requirements | 2019-12-20 to 2020-12-20 | |||||
91320413785566193D001R | Changzhou Tanglong Electronics Co., Ltd. | Special equipment manufacturing for semiconductor devices | 2 | Unorganized emission of organic waste gas | Organic waste gas treatment facilities are set up in accordance with the regulations and are discharged in an organized manner | 2019-12-21 to 2020-12-21 |
Data update frequency
Annual update